Mineral powder production lines

Complete production facilities, lines, and equipment for production of mineral powder with the productivity of 5 to 30 t/h.

General information

We offer you complete production facilities and processing lines for production of mineral powder according to the requirements of GOST (Russian National Standard) 52129-2003 within the productivity range of 5 to 30 t/h. Finished product of 0.315 mm class, according to GOST requirements, contains no less than 90% of 0.07 class.

The line is equipped with automated systems of liquid and solid surfactants supply and a smelting chamber, which allows producing both activated and non-activated mineral powder, depending on the current requirements and orders.

The line is equipped with an ACS that controls technological processes and mechanisms.

Natural gas or diesel / furnace oil or electrical power may be taken as the energy source for material drying.

Advantages of the line:

  • Equipment use factor > 0.8;
  • Low specific energy consumption (electrical equipment installed capacity 550-600 kW);
  • Does not require additional aspiration systems;
  • Low spatial requirements;
  • Ease of maintenance and usability.
 
 

Mineral powder is applied in production of bitumen-concrete mixtures of different classes. Mineral powder use leads to higher density and homogeneity of the asphalt concrete, prevents the moisture penetration, and lowers asphalt concrete water saturation, which has a positive effect on operating life of automotive roads.

Flow chart

 

mineral_powder_line_scheme_uralomega_30_t-h 

 

Configuration
Completeness:

Complete turn-key technological solution:

  • equipment of technological stages of processing
  • ACS, operator’s cabin
  • transportation systems
  • metal structures, ladders, platforms, railings

 

Optional configuration:

  • silo storage
  • preliminary crushing section
  • discharge packaging station
  • infrastructure equipment

Technical documentation:

Documentation provided by the supplier:

  • Plan (sections / cross-sections) of the processing line equipment
  • Anchorage plan (with loading) of the processing line
  • External electrical connections diagram

Workflow composition
Technological stages:
  • Feeding of the raw product into the hopper
  • Drying
  • Grinding
  • Feeding of the finished product into the pneumatic transport system
  • Packaging or feeding of the finished product into the silo storage
Infrastructure requirements
Minimum installation area:
70 х 30 m
Installation conditions:
Closed unheated space
Service mechanisms:
Beam-crane with the lifting capacity of no less than 5 t
Electrical supply: Voltage: 380 V, with the dedicated capacity of no less than 0.8 MW
Fuel:

Natural gas, operating pressure: 175-300 mbar.,

(required dedicated capacity depends on the material’s initial water content)

Flow chart

 

mineral_powder_line_scheme_uralomega_15_t-h

Configuration
Completeness:

Complete turn-key technological solution:

  • equipment of technological stages of processing
  • ACS, operator’s cabin
  • transportation systems
  • metal structures, ladders, platforms, railings

 

Optional configuration:

  • silo storage
  • preliminary crushing section
  • discharge packaging station
  • infrastructure equipment

Technical documentation:

Documentation provided by the supplier:

  • Plan (sections / cross-sections) of the processing line equipment
  • Anchorage plan (with loading) of the processing line
  • External electrical connections diagram

Workflow composition
Technological stages
  • Feeding of the raw product into the hopper
  • Drying
  • Grinding
  • Feeding of the finished product into the pneumatic transport system
  • Packaging or feeding of the finished product into the silo storage
Infrastructure requirements
Minimum installation area: 50 х 25 м
Installation conditions: Closed unheated space
Service mechanisms: Beam-crane with the lifting capacity of no less than 5 t
Electrical supply: Voltage: 380 V, with the dedicated capacity of no less than 1.1 MW
Fuel:

Natural gas, operating pressure: 175-300 mbar.,

(required dedicated capacity depends on the material’s initial water content)

 

 
Implemented projects
More than 267 mplemented projects for more than 200 clients